About Wauquiez
News
Our range
Contact
The saloon
Accueil
>
Home
>
Nos gammes
>
Pilot Saloon
>
Pilot Saloon 47
>
Construction
Pilot Saloon 65
Pilot Saloon 55
Pilot Saloon 47
GRP / Balsa sandwich hull built with the infusion process, for an optimum resin / fibre ratio.
Hull protected by the use of vinylester resin on the external layers of the sandwich.
One piece composite structure integrating lateral and longitudinal reinforcements, glassed and bonded to the bottom, spreading the rig and appendages efforts throughout the hull.
GRP / Balsa sandwich deck fitted on the hull via polyurethane bonding and mechanical fastening at bulwark level.
Lead bulb keel, fastened with stainless steel bolts, nuts and counterplates.
Cable transmission steering system with 2 steering wheels ; composite rudder shaft.
Teak side decks, cockipt seats and floor.
Construction
VIRTUAL TOUR
FEATURES
CONSTRUCTION
LAYOUTS
PRESS
PHOTOGALLERY
DEALERS
DOWNLOAD BROCHURE
DOWNLOAD GENERIC BROCHURE
© credits